Project & ODC Cargo

Heavy lift · Over-dimensional

What is ODC cargo, and how is it moved?

ODC (over-dimensional cargo) is cargo too long, wide, tall or heavy for a standard container or truck, such as transformers, turbines, boilers and plant machinery. It moves on flat racks, open tops or as breakbulk, then by hydraulic axle trailer, after a route survey and the road permits the size requires.

Project cargo is planned before it is quoted. We start with the drawings, weights and centre of gravity, check the route from port to site, and line up the vessel, the crane, the trailer and the customs filing so each hand-over happens on the day it should.

Wind-turbine blade on a heavy-haul trailer at a port quay
Crated machinery for export
Heavy liftPlanned port to site
Desk open 24 hours
Ports
Mundra and Kandla, the Gujarat ports built for heavy cargo
Equipment
Flat rack, open top, breakbulk, hydraulic axle trailers
Planning
Drawings, route survey, lifting and lashing plan
Permits
Road permits for oversize movements, arranged before dispatch

What's included

What does project cargo handling include?

Engineering first, then logistics. Every item is planned before anything is lifted.

Cargo study

Drawings, dimensions, weights and centre of gravity checked for every package.

Route survey

The road from port to site checked for bridges, bends, overhead lines and tolls.

Permits

Oversize movement permits and escorts arranged before the cargo lands.

Vessel and equipment

Flat racks, open tops or breakbulk space booked for the dimensions.

Lifting and lashing

Crane, lifting plan and lashing supervised at the berth.

Transport to site

Hydraulic axle or low-bed trailers to the project site, with escorts where required.

Process

How is an ODC shipment planned from port to site?

Most project delays come from surprises on the road. The survey comes before the booking.

  • Filed and followed by one team
  • Attended at the port
  • Clearance desk open 24 hours
Get a quote
  1. 01
    Project cargo import

    Cargo list and drawings

    Dimensions, weights and lifting points for each piece.

  2. 02
    Project cargo import

    Route survey

    Port-to-site road checked and any work planned.

  3. 03
    Project cargo import

    Permits and trailers

    Road permits applied for; trailers and escorts booked.

  4. 04
    Project cargo import

    Vessel and discharge

    Discharged by ship's or shore crane to the planned area.

  5. 05
    Project cargo import

    Customs clearance

    Bill of Entry filed, with project import registration where it applies.

  6. 06
    Project cargo import

    Loading and lashing

    Loaded onto the trailer and secured under supervision.

  7. 07
    Project cargo import

    Movement to site

    Moved on the permitted route and time, and unloaded at site.

Documents

What documents does a project shipment need?

The customs documents, plus the engineering data that plans the move.

Not sure what you have? Send photos of your documents on WhatsApp for a first check.

DocumentRequiredUsed for
Commercial invoice and packing listYesCustoms value and the list of packages
Dimension and weight listYesLength, width, height, weight and centre of gravity per piece
General arrangement drawingsYesLifting points, lashing points and equipment selection
Bill of ladingYesCarrier's receipt and title to the cargo
Route survey reportYesRoad permits and trailer choice
Road permitsFor oversize loadsAuthorises the oversize movement on the route
Project import registrationIf claimedProject import benefit on the Bill of Entry, where eligible

Requirements change with the commodity and the rules in force, so we confirm the list for your consignment with every quote.

Quote

Get a quote for Project & ODC Cargo

Rates and the document list for your consignment, back within 24 hours.

  • A team at the port, in Gandhidham
  • Clearance desk open 24 hours
  • Document list with every quote

No obligation. Fields marked * are required. See the privacy policy.

Equipment

Which equipment suits which cargo?

The size and weight of the heaviest piece decide the equipment.

EquipmentSuitsWatch out for
Open top containerTall cargo loaded by crane from aboveHeight over the top needs tarpaulin and carrier approval
Flat rack containerWide or tall machinery, vehicles, pipesOverwidth or overheight loses stacking slots and costs more
Breakbulk (vessel hold or deck)Very large or heavy piecesNeeds heavy-lift cranes and a port that handles breakbulk
Hydraulic axle trailerHeavy road moves to siteRoute survey and permits required
Low-bed trailerTall cargo that must stay under bridgesGround clearance on the route

Ports

Which ports handle our project cargo?

Mundra and Kandla have the berths, cranes and yard space that heavy cargo needs.

FAQ

Project cargo questions

ODC limits, permits, equipment and timing.

Need an answer now?

The clearance desk is open 24 hours.

What counts as ODC cargo?

Over-dimensional cargo is anything larger or heavier than a standard container or truck can carry within the normal legal limits: too long, too wide, too tall or too heavy. Transformers, turbine parts, boilers, reactors and large machinery are typical.

Why is a route survey needed?

A route survey checks the road from the port to the site for bridges and their load limits, tight bends, overhead lines, low structures and road works. It decides the trailer, the permits and sometimes the route itself, so it comes before the booking.

Do ODC movements need permits?

Yes. Moving cargo beyond the normal size and weight limits on public roads needs permission from the road authorities, and some loads need escorts or night-time movement. We apply for them once the route survey is complete.

Flat rack or breakbulk: which is better?

A flat rack keeps the cargo in the container system and suits moderately oversized pieces. Very large or heavy pieces go as breakbulk in the hold or on deck. The cargo dimensions, weight and the carriers on the lane decide.

Can you handle the customs clearance too?

Yes. We file the Bill of Entry and handle assessment, and where the project qualifies, the project import registration. Keeping customs and transport with one team avoids the cargo waiting at the port after discharge.

How early should a project shipment be planned?

As early as the drawings are ready. Route surveys, permits and specialised trailers take time to arrange, and heavy-lift vessels sail less often than container ships. Starting early is what keeps the site schedule.

Which ports do you use for heavy cargo?

Mundra and Kandla (Deendayal), both close to our Gandhidham office. They handle breakbulk and heavy-lift cargo and have the yard space to stage it before it moves to site.

Cargo already moving?

Tell us the port and the commodity. We come back within 24 hours with rates and the document list.

Quick connect

Request a callback

Prefer to call? +91 97141 41559 Clearance desk · open 24 hours

Fields marked * are required. See the privacy policy.

WhatsApp

Get a quote on WhatsApp

WhatsApp +91 97141 41559 · Clearance desk, open 24 hours.

Quick quote

Tell us about the shipment

Rates and the document list for your consignment, back in 24 hours.